One Roof, Complete Installations
3D printing, custom electronics, wood and aluminum cutting, painting, photogrammetry rigs. Everything needed to build a fully finished interactive installation under one roof. No external vendors. No coordination delays. Each phase informs the next because they all happen in the same space.
We built Durex, Geberit, DigiDouble at Maker Faire, and Avezzano che fu this way — everything fabricated, tested, and integrated in-house.
The value is speed: a new sensor enclosure designed in the morning, printed and tested by afternoon. Aluminum structures cut and surfaces painted without waiting for external coordination. Tight tolerances across disciplines, installations ready to work on-site day one.